Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 19 results ...

Cattell, D W, Bowen, P A and Kaka, A P (2011) Proposed Framework for Applying Cumulative Prospect Theory to an Unbalanced Bidding Model. Journal of Construction Engineering and Management, 137(12), 1052–9.

Cheung, S O and Chow, P T (2011) Withdrawal in Construction Project Dispute Negotiation. Journal of Construction Engineering and Management, 137(12), 1071–9.

Edwards, D J and Holt, G D (2011) Mini-Excavator Safety: Toward Innovative Stability Testing, Procurement, and Manufacture. Journal of Construction Engineering and Management, 137(12), 1125–33.

Eybpoosh, M, Dikmen, I and Talat Birgonul, M (2011) Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling. Journal of Construction Engineering and Management, 137(12), 1164–75.

Fonte, G C A (2011) Energy Management Reduces Great Pyramid Build Effort by More Than 98%. Journal of Construction Engineering and Management, 137(12), 1195–204.

Golparvar-Fard, M, Peña-Mora, F and Savarese, S (2011) . Journal of Construction Engineering and Management, 137(12), 1099–116.

Gouett, M C, Haas, C T, Goodrum, P M and Caldas, C H (2011) Activity Analysis for Direct-Work Rate Improvement in Construction. Journal of Construction Engineering and Management, 137(12), 1117–24.

Hartmann, T (2011) Goal and Process Alignment during the Implementation of Decision Support Systems by Project Teams. Journal of Construction Engineering and Management, 137(12), 1134–41.

Heon Jun, D and El-Rayes, K (2011) Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling. Journal of Construction Engineering and Management, 137(12), 1080–8.

Kale, S and Karaman, E A (2011) Evaluating the Knowledge Management Practices of Construction Firms by Using Importance–Comparative Performance Analysis Maps. Journal of Construction Engineering and Management, 137(12), 1142–52.

Kirgiz, M S (2011) Chemical Properties of Blended Cement Pastes. Journal of Construction Engineering and Management, 137(12), 1036–42.

Li, J and Zou, P X W (2011) Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects. Journal of Construction Engineering and Management, 137(12), 1205–9.

Li, N and Becerik-Gerber, B (2011) Life-Cycle Approach for Implementing RFID Technology in Construction: Learning from Academic and Industry Use Cases. Journal of Construction Engineering and Management, 137(12), 1089–98.

Li, Y Y, Chen, P, Chew, D A S, Teo, C C and Ding, R G (2011) Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore. Journal of Construction Engineering and Management, 137(12), 1153–63.

  • Type: Journal Article
  • Keywords: Green buildings; Project management; Environmental issues; Construction industry; Sustainable development; Singapore; Critical project management factors; Green building; Green Mark; Construction industry; Principal component factor analysis; Multiple reg
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000370
  • Abstract:
    In recent years, greater environmental awareness had induced the managers of building projects to “go green,” and several studies have been conducted on the project delivery of green building. However, there is no comprehensive study that explores the important project management factors from the perspective of architectural, engineering, and construction (AEC) firms, whose decisions can significantly affect the environmental performance of building projects. In Singapore, Green Mark, a certification for green building, has become a compulsory requirement for all new buildings. AEC firms are now facing challenges on how best to attain Green Mark certification with minimum cost and resources. The purpose of this research is to identify the controllable critical project management factors for delivering Green Mark certified projects to achieve higher Green Mark ratings. Nineteen controllable project management factors were first identified from related literature, and then a survey was carried out to collect data needed to perform the principal component factor analysis. The factor analysis revealed that the controllable project management factors could be grouped into five major components, namely, (1) human resource–oriented factors, (2) technical and innovation-oriented factors, (3) support from designers and senior management, (4) project manager’s competence, and (5) coordination of designers and contractors. Finally, multiple regression analysis was applied. It was found that the coordination of designers and contractors and technical and innovation-oriented factors are the most critical success factors, and possible reasons are discussed. With the help of the research findings, project organizations in Singapore will manage their Green Mark certified projects to achieve higher rating levels in a more efficient and effective way.

Love, P E D, Edwards, D J, Irani, Z and Goh, Y M (2011) Dynamics of Rework in Complex Offshore Hydrocarbon Projects. Journal of Construction Engineering and Management, 137(12), 1060–70.

Nahmens, I and Bindroo, V (2011) Is Customization Fruitful in Industrialized Homebuilding Industry?. Journal of Construction Engineering and Management, 137(12), 1027–35.

Swarup, L, Korkmaz, S and Riley, D (2011) Project Delivery Metrics for Sustainable, High-Performance Buildings. Journal of Construction Engineering and Management, 137(12), 1043–51.

Xia, B, Chan, A P C and Yeung, J F Y (2011) Developing a Fuzzy Multicriteria Decision-Making Model for Selecting Design-Build Operational Variations. Journal of Construction Engineering and Management, 137(12), 1176–84.

Zhou, H and Zhang, H (2011) Risk Assessment Methodology for a Deep Foundation Pit Construction Project in Shanghai, China. Journal of Construction Engineering and Management, 137(12), 1185–94.